|
|
1521 |
20-Jun-2013 |
Electrical work
PEDL/ NIT-11(5)/ 13-14 |
Department of Posts,Lucknow |
|
1522 |
20-Jun-2013 |
Electrical work
|
|
|
1523 |
20-Jun-2013 |
Electrical work
|
|
|
1524 |
20-Jun-2013 |
Electrical work
|
|
|
|
1525 |
16-Jul-2013 |
REPAIRING OF FLOOR WALL ETC. IN HARDENING SECTION (BUILDING NO. 29).
RFI-TN-NC-149-2012-13- EO.Dated-23.04.2013
Corrigendum available
|
Ordnance Factory Board,Kolkata |
|
|
1526 |
20-Jun-2013 |
Replacement of corroded members and loose rivets of bridge No.58UP, 87UP/DN, 92UP/DN, 39, 124 UP/DN and 45 under jurisdiction of BRI/I/KGP.etc.
T/PUB/2013/29, Srl.No.1 |
South Eastern Railway,kolkata |
|
|
1527 |
20-Jun-2013 |
Replacement of loose rivets, corroded and perforated corrosion guard and strengthening of existing trolley refuges of different girder bridges under jurisdiction of BRI/KGP-II
T/PUB/2013/29, Srl.No.2 |
South Eastern Railway,kolkata |
|
|
1528 |
20-Jun-2013 |
Renewal of existing worn out 60Kg. Switches 32 sets etc.under the jurisdiction of ADEN/JSG.(3rd Call).
03/2013-14 Srl No.1 |
South Eastern Railway,kolkata |
|
|
1529 |
20-Jun-2013 |
Provision of precast fibre reinforced RCC blocks for road surface at level crossings on double line route for 21 level crossings etc.
03/2013-14 Srl No.2 |
South Eastern Railway,kolkata |
|
|
1530 |
20-Jun-2013 |
Extension of Girder shop shed inside Engineering Workshop at Sini.
03/2013-14 Srl No.3 |
South Eastern Railway,kolkata |
|
|
1531 |
20-Jun-2013 |
Laying of new Ductile iron pipe 3520 mtr. Length from Bagbera pump house to new and old filter house at TATA.
03/2013-14 Srl No.4 |
South Eastern Railway,kolkata |
|
|
1532 |
20-Jun-2013 |
Repairs to existing signages at Tatanagar station.
03/2013-14 Srl No.5 |
South Eastern Railway,kolkata |
|
|
1533 |
20-Jun-2013 |
Construction of Road under bridge (limited height) including approach road etc.under the jurisdiction of ADEN/II/TATA.
03/2013-14 Srl No.6 |
South Eastern Railway,kolkata |
|
|
1534 |
20-Jun-2013 |
Extension of line No. 3 and 4 of Gua yard.
03/2013-14 Srl No.7 |
South Eastern Railway,kolkata |
|
|
1535 |
20-Jun-2013 |
Placement of 1T capacity truck for carrying Bridge materials of South Eastern Railway Chakradharpur Division over the jurisdiction of SSE(Works)/Dongaposi under DEN(South)/CKP
03/2013-14 Srl No.8 |
South Eastern Railway,kolkata |
|
|
1536 |
20-Jun-2013 |
Placement of 1T capacity truck for carrying Bridge materials of South Eastern Railway Chakradharpur Division over the jurisdiction of SSE(Works)/Chaibasa under DEN(South)/CKP
03/2013-14 Srl No.9 |
South Eastern Railway,kolkata |
|
|
1537 |
20-Jun-2013 |
Provision of precast fibre reinforced RCC blocks etc. under the jurisdiction of DEN(South)/CKP. (2nd Call).
03/2013-14 Srl No.10 |
South Eastern Railway,kolkata |
|
|
1538 |
20-Jun-2013 |
Construction of Subway/RUB at Km.401/2-3 (RBK-64) in between BBN-BYX under the jurisdiction of ADEN/DPS.
03/2013-14, Srl.No.11 |
South Eastern Railway,kolkata |
|
|
1539 |
20-Jun-2013 |
Placement of 1T capacity Truck for carrying Railway Materials of South Eastern Railway Chakradharpur Division over the jurisdiction of SSE(P.Way)/MOU under DEN(Central)/ CKP
03/2013-14, Srl.No.12 |
South Eastern Railway,kolkata |
|
|
1540 |
20-Jun-2013 |
In-situ re-conditioning of CMS crossings by using robotic welder technology as approved by RDSO, complete job with contractors labour, consumables, fuel, tools, plants etc.
03/2013-14, Srl. No.13
Corrigendum available
|
South Eastern Railway,kolkata |
|
[<-Prev]
Page
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
[Next ->]
|